Data Center design and build工序多、作業過程複雜,施工過程始終處於動態變化,因此Data Center design and build需要注意不少安全風險。

Data Center design and build需要注意什麼?

1.裝修裝修

● 材料運輸、對方、吊裝以及搬運需防火防盜。

● 考慮大樓承重問題。

2.配電問題

● Data Center design and build過程嚴格管控電動工具的使用,工人也要做好防護措施。

● 臨時配電實行三級管理,杜絕臨時線纜隨意敷設,設備上電前實行先測試後加電原則,並嚴禁私自加電操作。

● 對各系統線路需嚴格執行先計劃後施工原則,電纜敷設時避免操作不當造成線纜損壞。

● 運輸搬運需輕拿輕放,小心拆卸。

● 蓄電池安裝接線需正確,不得放置在易燃、易爆、腐蝕性氣體或液體附近,同時遠離熱源設備。

3.防雷問題

● 室外採用綜合接地接入點,嚴格區分工作地和保護地。

● 弱電機的接地電阻應低於0.5Ω。

4.消防問題

所有作業應由專業人員安裝調試。

* * * * * *

創世服務有限公司是一間提供專業數據中心架設公司,擁有一群專業團隊貼心地關注客戶的要求,並提供優質的服務。

想了解更多關於「Data Center design and build」的內容,請瀏覽創世官網:http:/*.hk

地址: 香港觀塘鴻圖道37-39號鴻泰工業大廈4樓4室

電話:852-31063235

——————

What to pay attention to in Data Center design and build

Data Center design and build have many procedures, complex operation process, and*nstruction process is always in dynamic changes. Therefore, Data Center design and build need to pay attention to many safety risks.

What should be paid attention to in Data Center design and build?

1.*ration

● Material transportation, counterparty, hoisting and handling must be fireproof and anti-theft.

● Consider the bearing of the building.

2. Power distribution problem

● The data center design and build process*ntrols the use of electric tools, and workers must take*asures.

● Temporary power distribution*nts three-level*nt, to prevent random laying of temporary cables,*nt the principle of testing before powering on the*nt, and it is strictly forbidden to power on without permission.

● Strictly*nt the principle of planning*nstruction for each system line, and avoid damage to the cables caused by improper operation during cable laying.

● Transport and handling should be handled with care and disassembly carefully.

● The battery must be installed*rrectly, and must not be placed near flammable, explosive, corrosive gas or liquid, and away from*urce*nt.

3. Lightning protection

● The integrated grounding access point is used outdoors to strictly distinguish the working ground and the protective ground.

● The grounding resistance of the weak motor room should be less than 0.5Ω.

4. Fire problem

All operations should be installed and debugged by professionals.

* * * * * *

LIV is a professional data center to set up*pany, with a group of professional team intimate attention to*r*nts, and provide quality services.

For*rmation about 'Data Center design and build',please visit : http:/*.hk

Address: Unit 4, 4/F., Hung Tai Industrial Building,37-39 Hung To Road, Kwun Tong, Hong Kong

Tel: +852 3106 3235
联系我的时候请说是在搜即讯信息网上看到的,谢谢。
首发网址:http://hkong.sojixun.com/wanluoweihu/z586001.htm
查看全部香港网络维护及布线信息
发布发布一条信息香港网络维护及布线信息>>